March 2008 Photo's of RailRoad Progress
![]() |
March 1st, the crew leveled and added ballast to another segment of track. |
![]() |
![]() |
![]() |
On March 22nd, our car barn is under construction. Floor area is prepared (left) and conduit run for power (lower left). Picture below shows Sanford yard area, from throat, with car barn in the background. Sanford is the northern terminus of our railroad |
![]() |
![]() |
Also, the road bed work on the loop around Sanford continued. Below, spoil from the car barn area is used as fill in part of the loop. Finally, our crushed concrete base was spread then compacted. |
![]() |
![]() |
![]() |
March 29th, we began assembly of a ballast bunker, built a switch and cleared for future steaming bays. |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |